Metro Gold LineTRANSIT PROJECTContractor:Ames ConstructionLocation:St. Paul, MNThe Metro Gold Line bus rapid transit project began construction in fall 2022 and will continue through 2024, with service scheduled to begin in March 2025. During the construction phase,...
Telescopic boom versatility combines with operational ease to provide maximum utilization.
- Outrigger spread is 20′ 5″
- 4-section boom
- Minimum unfolding height is 18′ 8″
- Vertical reach is 100′ 3″
- Net horizontal reach is 84′
- Output 170 yards per hour
- 9-ton legal
Telescopic boom versatility combines with operational ease to provide maximum utilization.